Illustrative image – not actual.The Khammam-Devarapalli access-controlled greenfield highway (NH-365BG), the first such corridor connecting Telangana and Andhra Pradesh, is set to become fully operational.
The 162.04-km highway stretch from Tallampadu village in Khammam district to Devarapalli in Andhra Pradesh was opened unofficially on 02 August, 2026 for motorists ahead of its formal inauguration. The project faced delays due to the construction of railway overbridges (ROBs) at Dhamsalapuram. With the ROBs now operational, vehicles can access the highway directly from Tallampadu instead of using the temporary Wyra-Devarapalli route. Designed for speeds of up to 100 kmph for cars, the project includes a 105-km stretch in Khammam district developed at a cost of Rs 2,213.91 crore.
The corridor is expected to reduce the Hyderabad-Visakhapatnam travel distance by around 60 km and cut journey time by one to two hours. It will also enable smoother movement toward Rajamahendravaram, Visakhapatnam, Odisha, and Kolkata by bypassing Khammam city.
