Illustrative image – not actual.The Kerala Water Authority (KWA) will augment two existing water treatment plants at Aruvikkara by 10 MLD each, adding to the city’s treatment capacity and taking their combined capacity from 146 MLD to 166 MLD.
The 72 MLD plant will be expanded to 82 MLD, while the 74 MLD plant will increase to 84 MLD. The project has received first-phase administrative sanction, including contribution from the Asian Development Bank and funding under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT). The additional capacity is expected to improve water supply in elevated areas such as Palayam, Vazhuthacaud and Kowdiar, as well as Kazhakkoottam. KWA is also replacing ageing pipelines in Peroorkada to strengthen distribution.
With daily demand exceeding 400 MLD, the combined capacity and network improvements are expected to enhance treated-water availability and reduce supply disruptions.
