Illustrative image – not actual.The Union Railway Ministry has revived Kerala’s long-delayed SilverLine semi-high-speed rail project by directing the State to revise its detailed project report (DPR).
A key change is the requirement to adopt broad gauge (BG) tracks instead of the previously proposed standard gauge. This move aligns the project with emerging national standards for semi-high-speed BG corridors being developed by the Railway Board, drawing on experience from the Sarkhej–Dholera project in Gujarat under Western Railway. The Kerala Rail Development Corporation (K-Rail), which is implementing the project, has been asked to update the DPR in consultation with Western Railway.
Earlier, Indian Railways had suggested integrating SilverLine with the existing BG network to enable mixed traffic, including express, passenger, Vande Bharat, and freight trains operating at speeds of up to 160 kmph. However, the State government had opposed this, insisting on a dedicated corridor for efficiency. With the revised BG approach, the project largely remains unchanged but gains flexibility. Alos, the Railways has approved surveys for major capacity expansion projects across Kerala’s rail network. These include third and fourth lines on the 307 km Shoranur–Mangaluru stretch and the 99 km Coimbatore–Shoranur route. Additional third lines are planned on key corridors: Shoranur–Ernakulam (106 km), Ernakulam–Kayamkulam via Kottayam (115 km), Kayamkulam–Thiruvananthapuram (105 km), and Thiruvananthapuram–Nagercoil (71 km).
