Illustrative image – not actual.The Indian Railways expects to complete the Rs 19,500-crore rail line that will link the Kashmir valley with the rest of country by December 2017. The 345-km line will link towns of Udhampur, Katra, Baramulla and Qazigund to Jammu.
The 273-km link connecting Udhampur to Baramulla has been divided into three sections. It includes a 25-km Udhampur-Katra stretch that is to be completed by December 2012. The 129-km stretch between Katra and Qazigund will comprise a 11-km Pir Panjal Tunnel and a 1,315-mtrs long Chenab bridge. Meanwhile, the 120-km line between Qazigund and Baramulla has been completed by IRCON and is open to the public.
Related Links:
Project profile
