Karnataka to bring in Japanese expertise for bullet trainsIllustrative image – not actual.

The Karnataka Government is holding discussions with the Japanese experts who have built and operate bullet trains in their country, especially between Tokyo and Osaka, to provide high-speed rail connectivity in the state.

The state government proposes to operate 'bullet trains' across the state between Bangalore and Mysore (150 km), Bangalore and Belgaum (610 km) and Bangalore and Gulbarga (585 km). It has roped in the Japanese International Cooperation Agency (JICA) to prepare DPR for the project.

Meanwhile, the state government is also planning to build a tunnel through the 28 km Shiradi ghat section on the Bangalore-Mangalore (325 km) state highway to reduce travel time and provide a high-quality road to enable exporters and importers use the Mangalore port optimally than depend on ports in other states. The Japan External Trade Organisation (JETRO) has offered to provide technical assistance in building the tunnel with private builders on the PPP model.

← All latest storiesBack to top →