Illustrative image – not actual.Karnataka Renewable Energy Development (KREDL) has allocated the first 80 MW of solar photovoltaic (PV) and concentrating solar power (CSP) projects through the Karnataka Solar Policy.
KREDL has awarded contracts for 20 MW of CSP and 60 MW of PV projects were awarded in this first round of bidding. The lowest bid came in at Rs 7.94/kWh by Helena Power for a 10 MW PV plant and the highest successful bid at Rs 8.50/kWh by Welspun Solar AP for a 7 MW PV plant. Other successful bidders include Sunborne Energy Services India and Atria Power Corporation, each with 10 MW CSP plants, and Jindal Aluminum, GKC Project and Sai Sudhir Energy each with 10 MW PV plants. Additionally, ESSEL Infrastructure - Gulbarga and ESSEL Infrastructure - Badami will build 5 MW PV plants, with United Telecoms finishing off the batch with a 3 MW PV plant.
As per the terms of the program, CSP projects must be commissioned within 30 months of signing a PPA, and PV projects within 18 months.
