Illustrative image – not actual.Jaypee Karcham Hydro Corporation's Unit I of 250 MW of Karcham Wangtoo hydel based power project on 25 May 2011 commenced power generation in Himachal Pradesh.
The 1,000 MW (4x250) hydel based power project is being implemented on BOO basis. The project is located on River Satluj in Kinnaur district of the state.
The project envisages a concrete gravity dam about 83 mtrs high above the river bed. The other main component of the project are: 10.48 mtrs diameter, 17.2 km long head race tunnel, 4.75 mtrs diameter four pressure shafts, an underground power-house with 4 x 250 MW installed capacity, transformer hall and 909 mtrs long 10.48 mtrs diameter tail race tunnel. The diversion of river is envisaged by construction of a diversion tunnel.
Related Links:
Project profile
