Kanhaiya Lal Agrawal declared L1-bidder for four-laning of Keonchi-Ratanpur section of NH-45Illustrative image – not actual.

Kanhaiya Lal Agrawal has been declared the lowest bidder (L1) for the four-laning of a 5.275 km stretch of National Highway-45 between Keonchi and Ratanpur in Chhattisgarh.

The work will be carried out under Package 03, km 0.000 to km 5.275 on an engineering, rrocurement, and construction (EPC) mode. The upgrade involves converting the existing roadway into a four-lane configuration with paved shoulders, designed to improve traffic capacity, safety, and travel efficiency. The company successfully bid with a quote of Rs 124.22 crore, for the contract issued by the Ministry of Road Transport & Highways (MoRTH). This development will also enhance the integration of local road networks with the national highway system, contributing to regional connectivity and logistics efficiency.

The project forms part of broader efforts to strengthen national highway infrastructure and promote sustainable economic growth in Chhattisgarh.

← All latest storiesBack to top →