Illustrative image – not actual.The Kandla Port Trust is making a second attempt to build a container terminal, the bidding process for which has already begun. Tenders for port operators, which was floated a few months back, has attracted nearly a dozen interested parties, which includes international players of the likes of Maersk, Skansa Abot AB, Van Oord Acz and Samudra Shipping, etc. Prospective Indian bidders include Larsen and Toubro, Shreyas Shipping, Seaways Shipping, United Linear Agency and Gammon India, etc.
The terminal will be leased out
for a 30-year period and will require an estimated investment of Rs.175 crore
in two phases. It is proposed that the terminal will have two berths with a
quay length of 414 m and 11 hectare back-up area. The estimated throughput in
the first year is 172,000 TEU, which will be further increased to 450,000 TEU
in the ninth year.
Related News:
