Illustrative image – not actual.Kandhamal district administration is planning to build portable bridge at Jingiriguda under Daringibadi block.
The bridge is under-construction and expected to be completed within a month. Being constructed under Integrated Action Plan (IAP), a central government scheme, in the Maoist-infested district has 150 ft length. The estimated cost of bridge is Rs 1.7 crore.
Made of steel, the portable bridge is designed on unit construction principle with the base unit being around 10 ft long bay and when the bays assembled together it creates a bridge of different lengths which can also be shifted from one place to another in future.
Source: IBN 7
