Juniper Green begins commissioning of India’s first FDRE project  with solar, wind and battery storageIllustrative image – not actual.

Juniper Green Energy has achieved a major milestone by beginning commissioning of India’s first firm and dispatchable renewable energy (FDRE) project under the Government of India’s flagship guidelines.

This pioneering initiative combines 259 MWp solar, 280 MW wind, and 200 MWh battery energy storage systems (BESS) across Rajasthan and Gujarat, creating an integrated platform to deliver reliable, dispatchable clean power aligned with grid demand. The FDRE framework, introduced by the Ministry of Power in June 2023, addresses a key challenge in renewable energy—intermittency. Solar power generation ceases at night, while wind energy cannot always be dispatched on demand. The guidelines mandate integrating solar, wind, and storage to ensure consistent, scheduled power supply tailored to distribution companies’ needs. Key milestones have already been achieved, with the solar component entering commercial operations in March 2026 and the BESS component in April 2026.

Once fully operational, the project will significantly enhance grid stability, reduce dependence on fossil fuels, and set a benchmark for future large-scale renewable energy projects in India’s evolving power sector. “This marks the start of India’s first Firm and Dispatchable Renewable Energy project — a defining milestone in our vision to deliver firm and dispatchable renewable power. It reflects Juniper Green Energy’s strong execution capabilities, technological depth, and commitment to shaping the future of sustainable energy,” said Ankush Malik, CEO, Juniper Green Energy. 

← All latest storiesBack to top →