JSW Energy secures 200 MW BESS orderIllustrative image – not actual.

JSW Energy’s step-down wholly-owned subsidiary JSW Energy PSP Eleven (JEPEL) has secured orders worth Rs 443.74 crore.

The order are for the supply of battery energy storage systems (BESS) and power conversion system (PCS) solutions to Bondada Renewable Energy, a subsidiary of Bondada Engineering. The contract involves the supply of 200 MW/400 MWh of BESS capacity, marking a significant milestone in JSW Energy’s strategy to strengthen its presence in the energy storage segment. It supports India’s transition towards a flexible and reliable power ecosystem by enabling grid stability, peak load management, renewable energy integration and round-the-clock power supply.

The company currently has a total locked-in generation capacity of 32.1 GW, including operational assets, projects under construction and a development pipeline across thermal, hydro and renewable energy sectors. JSW Energy aims to achieve 30 GW generation capacity and 40 GWh energy storage capacity by 2030, while targeting carbon neutrality by 2050.

← All latest storiesBack to top →