Illustrative image – not actual.
Jindal Steel and Power (JSPL), is planning to commission its two million tpa steel melting shop in Oman by October 2013.
JSPL has invested $ 500 million (approx Rs 2957 crore) to set up the facility in Oman. The proposed facility includes 1.5 million tpa DRI/HBI unit and the upcoming two million tpa steel melting shop project.
The steel melting shop will produce billets to make bars, rods and long products.
Meanwhile, the company is likely to commission its steel mills in Angul, Orissa by November 2013, which has an installed capacity of two million tpa.
