Illustrative image – not actual.Jaiprakash Power Ventures (JPVL) has resumed operations at its 400 MW Vishnuprayag hydroelectric project.
The plant based in Chamoli, Himachal Pradesh, had been shut down since 7 February 2021 after river water gushed into its Tail Race Tunnel following a glacial outburst that severely damaged 520 MW NTPC Tapovan Vishnugad project and 13.2 MW Rishi Ganga project.
The company after carrying out extensive cleaning of the Tail Race Tunnel of the project and other associated systems and thorough checking of all elements of the project, it has resumed operations.
The plant based in Chamoli, Himachal Pradesh, had been shut down since 7 February 2021 after river water gushed into its Tail Race Tunnel following a glacial outburst that severely damaged 520 MW NTPC Tapovan Vishnugad project and 13.2 MW Rishi Ganga project.
The company after carrying out extensive cleaning of the Tail Race Tunnel of the project and other associated systems and thorough checking of all elements of the project, it has resumed operations.
