Illustrative image – not actual.Jawaharlal Nehru Port trust (JNPT) is planning to begin dredging work in 2003-04 at a cost of Rs.700 crore. Draught in the dock basin is expected to increase to 13.5 metres from 12.5 metres, after the removal of
40 million cubic metres of material. The Central government is expected to provide grant for the proposed dredging. The company plans to part fund the dredging by raising bonds from the market.
