Illustrative image – not actual.JNPT has sought funds from the Union Shipping Ministry's proposed infrastructure bonds to fund its channel deepening plan.
The trust has sought about Rs 5,000 crore from port infrastructure bonds. It was to raise the said funds as a soft loan from the Japan International Cooperation Agency (JICA). Since, it is likely to face a procedural delay; the port is looking at an alternate option.
JNPT plans to increase its draft from 12 mtrs to around 14.5 mtrs under Phase I of its expansion at a cost of Rs 1,400 crore. It plans to start dredging by December 2011.
Also See:
