J&K govt. to revive 120-year-old Mohra hydel power projectIllustrative image – not actual.

The Jammu and Kashmir government has announced the revival of the historic Mohra Power Project, a 120-year-old hydroelectric facility which has remained non-operational since the 1990s.

The move comes as the government accelerates work on power projects following recent developments related to the Indus Water Treaty. Chief Minister Omar Abdullah, who also holds the power portfolio, informed the Assembly that the process for reviving the project has been initiated by the J&K State Power Development Corporation. Located on the banks of the Jhelum River in Baramulla district, the Mohra Power Project was commissioned in 1905 and is among the oldest hydroelectric plants in India. Originally built as a run-of-the-river system, it had an initial capacity of about five MW. However, severe flood damage in 1992 affected its infrastructure, leading to a gradual decline in power generation and eventual shutdown.

The project is known for its unique wooden water channel stretching over 10 km along mountainous terrain, once used to transport water to turbines. The revival plan includes renovation, modernisation, and upgraded operations, contributing to the region’s goal of significantly increasing power generation capacity by 2035.

← All latest storiesBack to top →