Illustrative image – not actual.Jindal Steel & Power Ltd (JSPL) expects to achieve financial closure for its Rs.400 crore rail and universal beam rolling mill at Raigarh in Chhattisgarh, by October 2001. The company plans to meet the cost of the mill through debt and internal accruals equally.
The mill, a second hand one, has been sourced from
South Africa. It will manufacture rails of 120 metres - the longest in the
world. These rails are expected to enable Indian Railways to run trains at a
speed of more than 300 km per hour.
Presently, in India, only Steel Authority of India
manufactures rails and that too of a length of 13 and 26 metres. These rails
are then welded together to form 130 metre long rails, which are used by the
railways. This in turn results in 18 welded joints per half km and seven
fishplate joints per km.
On the other hand, when four of JSPL’s rails are
welded together, to get a length of 480 metres, it will have just four welded
joints per half km and three fishplate joints per km. This will help in smoothening
the tracks by bringing down frictional resistance substantially.
