Illustrative image – not actual.Japan Bank of International Cooperation (JBIC) has agreed to fund Kolkata Metro Rail Corporation's (KMRC) proposed East-West metro extension from Salt Lake up to the Kolkata airport.
The construction of 6.5-km track will cost Rs 800 crore. KMRC has already engaged RITES for preparing the DPR for the extension.
The decision came after a study commissioned by the transport department stressed on the need for a mass rapid transit system (MRTS) connectivity between the airport and the city. Currently, the annual passenger handling capacity of the two airport terminals is 0.6 crore. Once the integrated building becomes operational, the capacity will increase to two crore. KMRC expects to complete the link by 2010.
Also See:
Foundation stone laid for East-West Kolkata Metro corridor (23-Feb-09)
Related Links:
Project profile
