Illustrative image – not actual.
Jaipur Metro Rail Corporation (JMRC) has finalised the engineering, procurement, and construction (EPC) model for the construction of Jaipur Metro Line 2, running from Sitapura to Vidyadhar Nagar.
To finance the project, the state government is pursuing soft loans from agencies like Japan International Cooperation Agency (JICA), with the state and Union government covering 40 percent of the total cost.
The state government is in the final stage of converting JMRC into a joint venture with the Central government, allowing for a more viable funding structure. Under this arrangement, the state and Centre will each contribute 20 percent of the construction cost, while the remaining 60 percent will be financed through a soft loan.
The funding approach is different from Jaipur Metro Line 1, which was entirely state-funded, while the second phase (Chandpole to Badi Chaupar) was financed through a Rs 969 crore loan from Asian Development Bank (ADB). A joint venture model with the Union government would enable JMRC to secure international funding more readily.
