Jagadish Shettar inaugurates power transmission line in KarnatakaIllustrative image – not actual.

Jagadish Shettar, Chief Minister of Karnataka on 12 September 2012 inaugurated a power transmission line in Karnataka.

The transmission line from Udupi to (Shanthigrama) Hassan will evacuate power from the 1,200 MW thermal power plant of Udupi Power Corporation (UPCL). The 400 kV line which is 186 km in length has been set up at a cost of Rs 400 crore by Karnataka Power Transmission Corporation (KPTC).
 

← All latest storiesBack to top →