Illustrative image – not actual.IVRCL Infrastructure and Projects Ltd expects to complete the works on its desalination plant at Minjur near Chennai by June 2008. The Rs.510-crore plant will have a capacity of 100 million litres a day (MLD).
The Tamil Nadu government has issued the letter of intent to IVRCL, which has formed a joint venture called Chennai Water Desalination Ltd with Befesa of Spain, the technology partner for the desalination plant project.
The project, which is expected to increase the drinking water availability in Chennai, will be built on a DBOOT (design, build, own, operate and transfer) basis for a period of 25 years. The cost of water being Rs.48.66 per kilo litre.
Of the Rs.510 crore, the equity portion will be Rs.138 crore, in which IVRCL has 75 per cent stake, with Befesa holding the rest. IVRCL has tied up with banks for loans to fund the project. The desalination plant, which is reported to be the first one of its kind in the country, attained financial closure on 25, January 2007.
The present water requirement for Chennai city and the adjacent local bodies is around 1,470 MLD, where as the present supply level is only 650 MLD. The main source of water supply to Chennai is surface water sources such as Poondi, Cholavaram and Redhills reservoirs, and also ground water sources such as Araniar and Kosatalayar river basin.
Related Links:
Project
details
