IVRCL bags Rs.478 crore contract for Indira Sagar irrigation projectIllustrative image – not actual.

IVRCL Infrastructures & Projects bagged an order worth Rs.478.48 crore from Narmada Valley Development Authority, Bhopal for execution of  canal system of Indira Sagar Project Phase-III, Sanawad in district of Madhya Pradesh for a total length of 46 km of the canal and 5 km of tunnels including distribution network upto 40 ha chak for irrigation culturable command area of about 20700 ha on turnkey basis.

The scope of work includes survey, planning, design, estimation, reparation of land acquisition cases, forest case and its clearance, shifting of H.T. and L.T, electric lines. Construction of canal by excavation / earth work, cement concrete lining with paver machine, all inline concrete structures like V.R.B / D.R.B / N.H.B/ S.H.B/ C.D. WORKS.

The proposed project is expected to be completed over a period of 48 months.

Related Links:
Project profile

← All latest storiesBack to top →