Isgec Heavy Engineering bags contract for cement waste heat recovery boilersIllustrative image – not actual.
Isgec Heavy Engineering has received an order from Shree Cement for cement waste heat recovery boilers (WHRB) for their 3.8 million tpa clinker capacity, integrated cement plant at Nawalgarh, Jhunjhunu district in Rajasthan. 
 
The scope of work includes designing, manufacturing, and supplying of PH Boiler in the pre-heater exhaust and AQC Boiler in the cooler exhaust. This will be one of the world's largest capacity cement waste heat recovery-based green energy steam generation plant and will be used for generating 35.5 MW of power.
 
The company had earlier set up similar cement waste heat recovery boilers for Shree Cement at their Raipur Line-3 plant. The current order for the Nawalgarh site will be the third project that Isgec Heavy Engineering has received from Shree Cement.
← All latest storiesBack to top →