Illustrative image – not actual.
The Irrigation and Flood Control Board has approved a significant project for the revamp of the Najafgarh drain in Delhi.
The project includes large-scale desilting aimed at addressing chronic siltation, which has restricted the flow of the drain and increased the risk of flooding. A recent bathymetric survey revealed that over 91 lakh cubic mtrs. of silt had accumulated, exacerbating the problem. Additionally, the board cleared a Rs 453.95-crore plan for constructing two-lane service roads alongside the drain to improve mobility and accessibility. The desilting work will be carried out under an 'Expression of Interest' process.
This initiative is part of ongoing efforts to enhance drainage infrastructure and mitigate flood risks in the region. The revitalisation of the Najafgarh Drain is expected to significantly improve the drainage system's efficiency, benefiting local residents and businesses. The project aims to boost flood resilience and reduce waterlogging during the monsoon season.
