Illustrative image – not actual.
Ircon International has invited bids for construction of three railway bridges.
The railway bridges will be developed on stilt at Ch 144.804 to 145.524 (bridge length 720 mtr), Ch 150.200 to 150.530 (bridge length 330 mtr) and 153.285 to 153.909 (bridge length 624 mtr) in coastal regulation zone (CRZ-I) area of Dahanu Detour in connection with construction of western dedicated freight corridor (Phase-II) in Thane district of Maharashtra.
The estimated value of project is Rs 148.29 crore.
