Illustrative image – not actual.IRB Infrastructure Developers have received an LoA from NHAI to develop the Ahmedabad-Vadodara section of NH-8 in Gujarat.
The project includes six-laning of Ahmedabad-Vadodara section of NH-8 from Km 6.400 to Km 108.700, a total length of 102.300 km and will undertake the improvement of existing Ahmedabad Vadodara Expressway from Km 0.0000 to Km 93.302, a total length of 93.302 km under Phase -V on DBFOT Toll basis.
IRB Infrastructure is currently scouting to form a SPV for the project as per the provision of the bid within 30 days of receiving of LoA.
Related Links:
Project profile
