Illustrative image – not actual.IRB Infrastructure Developers have emerged as the preferred bidder for a road project in Gujarat.
It includes six-laning of Ahmedabad to Vadodara section of NH-8 from Km 6.400 to Km 108.700 (length 102.300 km) and improvement of existing Ahmedabad Vadodara Expressway from Km 0.000 to Km 93.302 (length 93.302 km.).
The project costing Rs 3,600 crore will be executed on DBFOT Toll basis. The project has a concession period of 25 years and a construction period of three years.
Also See:
Funds tied-up for Tumkur-Chitradurga road project (18-Feb-11)
Related Links:
Project profile
