IOC plans solar plant at BarmerIllustrative image – not actual.

Indian Oil Corporation (IOC) proposes to set up a grid-linked solar power plant at Barmer in Rajasthan at a cost of about Rs 100 crore.

As per sources, IOC will set up the plant as an equal venture with BHEL. The plant is to be set up on a parcel of land belonging to IOC's marketing division, while BHEL will supply the panels and other equipment.

Besides, the company is to set up a 25 MW wind based power plant with Suzlon at Kandla in Gujarat at an investment of Rs 130-140 crore.

← All latest storiesBack to top →