Illustrative image – not actual.Indian Oil Corporation (IOC) has
commissioned the 70 km long Sonepat-Meerut petroleum product branch pipeline.
The pipeline was formally commissioned by switching on the delivery valve at
the Meerut delivery station on 23 November 2000.
The pipeline, constructed at a
cost of Rs.44 crore, has a capacity of six lakh tonnes per annum. The pipeline
would be used to transport petroleum products from IOC’s refinery at Mathura to
Meerut both in Uttar Pradesh.
