Illustrative image – not actual.
The new interchange at Igatpuri on the Nagpur-Mumbai Samruddhi Mahamarg in Maharashtra is scheduled to be completed by December 2022.
The Cabinet committee on infrastructure has approved Rs 249.67 crore for construction of interchange and connector at Igatpuri that will connect the Samruddhi Mahamarg with Nashik city through Mumbai-Agra national highway.
The interchange allows vehicles travelling by expressway to exit and others to enter the highway. While one interchange is being constructed in Sinnar, allowing vehicles on Nashik-Pune highway to access Samruddhi and vice-versa, the exchange coming up in Igatpuritaluka will allow vehicles travelling by Mumbai-Agra national highway.
Around 70 percent of the work on the 97 km stretch passing through Nashik district has been completed.
The interchange will have 18 km connector that will be developed by the Maharashtra State Road Development Corporation (MSRDC).
An underpass will be constructed at Wadivarhe, widening and strengthening of the existing road from Wadivarhe to Kawad-dara into two-lane concrete road, 800 mtr four-lane road near the interchange will be done.
This interchange was planned to ensure that heavy vehicles travelling towards JNPT from Dhule or towards Nagpur from the industrial belt in Nashik district get the advantage of the expressway.
