Inspections to begin for Namma Metro Pink Line elevated stretch ahead of May launchIllustrative image – not actual.

The Research Designs and Standards Organisation (RDSO) is set to begin a series of vital inspections on the elevated section of Bengaluru's Namma Metro Pink Line, with the Bangalore Metro Rail Corporation (BMRCL) aiming to open the corridor by May 2026.

Officials confirmed that inspections will begin by the end of March and continue until the first week of April. The RDSO team will evaluate the 7.5-km elevated stretch between Kalena Agrahara and Tavarekere. These trials will cover train speed and load tests, alignment and track checks, station infrastructure inspections, and verification of power systems. A senior BMRCL official emphasised that this inspection is a crucial step in the commissioning process, ensuring safety and performance standards are met before public operations begin. The Pink Line, after several delays, is now in its final stages of readiness. BEML is contracted to provide 318 Metro cars under a Rs 3,000-crore agreement.

The first phase will open the elevated stretch, with the remaining underground section expected to be completed by the end of 2026.

← All latest storiesBack to top →