Indore-Ichhapur highway project with three tunnels to be completed by Dec 2026Illustrative image – not actual.

The long-awaited Indore-Ichhapur highway project, aimed at easing traffic and improving safety on the stretch between Indore and Khandwa, is set to be completed by the end of December, 2026.

The project includes the construction of three modern tunnels designed to ensure smooth traffic flow even during heavy rainfall and thick fog. A key component of the project is the 33.40 km four-lane stretch from Tejaji Nagar in Indore to Balwada in Khandwa, which will provide direct connectivity to Hyderabad via Jalgaon. The National Highways Authority of India (NHAI) is using advanced methods like electronic blasting and the Austrian tunneling technique (NATM) for the construction. Indore and Khandwa are crucial for the state's economy, with Indore as the commercial hub and Khandwa as a vital gateway to southern India.

The project involves key structures, including the 575-mtrs. Bherughat Tunnel, 480-mtrs. Baigram Tunnel, and 550-mtrs. Choral Ghat Tunnel, along with a major bridge, a railway overbridge, two viaducts, vehicle overpasses and underpasses, and several minor bridges and culverts. The new infrastructure will reduce travel time significantly, offering safer and faster travel at speeds of 80-90 km/hr, and will be an essential part of the Indore-Hyderabad Corridor, improving transportation of goods.

← All latest storiesBack to top →