India’s pumped storage project pipeline reaches 24 GWIllustrative image – not actual.

India’s pumped storage project (PSP) pipeline is gaining momentum, with around 24 GW of capacity currently under construction, appraisal or examination by the Central Electricity Authority (CEA).

As per government data, 11 pumped storage projects with 15,870 MW capacity are under construction across the country, while six projects totalling 8,140 MW have received CEA concurrence or are under appraisal and awaiting construction. Another 640 MW project is under examination. Pumped storage projects play a crucial role in integrating renewable energy by storing surplus electricity and supplying power during peak demand periods, while enhancing grid stability and reliability. The CEA has prepared a roadmap to add 100 GW of pumped storage capacity by 2035-36.

Alongside PSPs, the government is promoting battery energy storage systems (BESS) through initiatives such as viability gap funding (VGF). These efforts aim to strengthen energy storage infrastructure in India, and support future renewable energy projects, infrastructure projects and development projects.

← All latest storiesBack to top →