Illustrative image – not actual.
Maharashtra Chief Minister Devendra Fadnavis flagged off the 11.28 km Phase-II of the Chembur-Wadala-Jacob Circle Monorail Network on 3 March 2019.
With this, the entire 19.54 km route is now operational. This is the country’s first monorail system implemented by the Mumbai Metropolitan Region Development Authority (MMRDA).
Phase-I of 8.26 km, built and operated by a consortium of Larsen & Toubro and Malaysian firm Scomi Engineering, was commissioned in February 2014.
At almost 20 km, Mumbai Monorail is the third largest route in the world after China and Japan.
The project has been constructed at the cost of Rs 3,000 crore.
The nodal agency plans to operate 120 services with a fleet of seven trains of four-coach between six am and 10 pm daily. The fare has been fixed between Rs 10 to Rs 40.
