Indian Road Congress targets to increase NH length to 80,000 km by 2021Illustrative image – not actual.

Indian Road Congress (IRC), an apex body for the development of road networks in the country, has targeted for increasing the length of the National Highways to 80,000 km in the country from the present 66,600 km by the end-2021.

The IRC has aimed for converting the existing 16,000 km two-lane National Highways into four-lane and constructing the 16,000 km of express highways. At present, there are only 200 km of express highways in the country. The IRC had also planning for doubling the existing State Highways by the end of 2021.

To achieve the target fixed by the IRC, the Union government has come out with a Phase VII National Highway Development Programme (NHDP).

In the first two phases of the NHDP, the Golden Quadrilateral connecting the four metropolitan cities of Delhi-Mumbai-Chennai and Kolkata covering a length of 5,846 km, is nearing completion and the Phase II of the NHDP of north-south and east-west corridors connecting Srinagar to Kanyakumari and Silchar to Porbandar covering 7,300 km and providing port connectivity to all 10 major ports with National Highways covering a length of 1,157 km has now been taken up.

Also See:

NHDP III-B awaits Cabinet approval (02-Dec-06)

← All latest storiesBack to top →