Indian Railways set to commence work on DFC project Illustrative image – not actual.

Indian Railways is all set to begin work on the Dedicated Freight Corridor (DFC) project connecting Punjab with West Bengal and UP with Maharashtra.

The Rs 80,000-crore Dedicated Freight Corridor (DFC) project will come into two phases. In Phase I, DFCCIL will be constructing two corridors — the Western DFC and Eastern DFC — spanning a total length of about 3,300 km. The Eastern Corridor, starting from Ludhiana in Punjab, will pass through the states of Haryana, Uttar Pradesh, Bihar and terminate at Dankuni in West Bengal. The Western Corridor will traverse the distance from Dadri to Mumbai, passing through the states of Delhi, Haryana, Rajasthan, Gujarat and Maharashtra.

Around 80 per cent of the land required for the project has been acquired. Soon, tenders for laying of the first 1,000 km of tracks (worth around Rs 10,000 crore) of the 3,300 km project would be awarded in FY13. The deadline for the project is 2016-17.

Related Links:
Project profile

← All latest storiesBack to top →