Illustrative image – not actual.The Ministry of Railways has sanctioned the final location survey (FLS) for the proposed doubling of the railway line between Palakkad and Podanur via Pollachi, marking a significant step to enhance rail connectivity between Kerala and Tamil Nadu.
Union Minister for Railways Ashwini Vaishnaw informed Minister of State George Kurian about the sanction following earlier discussions on the long-pending project. The new alignment, running parallel to the existing Palakkad-Coimbatore line, aims to overcome operational challenges posed by ghat sections, forest areas, wildlife crossings, and steep gradients that limit train speeds. Although the proposed route will be around 40 km longer, the easier terrain will allow higher-speed operations and improve operational flexibility for passenger and freight services. "The FLS will pave the way for detailed technical assessment and alignment planning for the project. The survey has now been sanctioned and the detailed field work will begin shortly. The survey is expected to take around five to six months," the officer added.
With administrative approvals and work sanction, construction could be completed within about two years, involving an estimated investment of Rs 500 crore, reducing congestion and strengthening rail infrastructure in the region.
