Illustrative image – not actual.The study will be carried in order to increase the speed of the trains to 200 km per hour.
The study will be carried out on a 50:50 percent cost sharing basis.
The joint declaration is intended towards achievement in the priority area of Semi High Speed Rail: the upgrading of current passenger services to SHS (Semi High Speed) upto 200 km per hour on the Chennai-Kazipet corridor (643 km).
The project is envisaged to consist of three phases to be carried out over a 22 month period.
The Chennai-Gudur Jn-Nellore-Tenali Jn-Vijayawada Jn-Warangal-Kazipet Jn will stretch over a total length of 643 km (135 km in Southern Railway and 508 km in South Central Railway).
