Indian Oil Corpn to commission Ennore LNG terminal in January 2019Illustrative image – not actual.

The Indian Oil Corporation (IOC) will commission its liquefied natural gas (LNG) import terminal at Ennore in Tamil Nadu in January 2019. This is the first LNG terminal that IOC has built on its own.

The facility was built at a cost of Rs 5,151 crore and will be commissioned after completion of dredging of the channel that will bring cryogenic ships carrying natural gas in its liquid form to the port.

Once dredging is complete, IOC will bring a cargo or shipload of LNG to commission the terminal. The dredging is being carried out by Ennore Port Trust.

IOC holds 12.5 percent stake in Petronet LNG, which operates import facilities at Dahej in Gujarat and Kochi in Kerala. It has also booked capacities in upcoming terminals on both east and west coast.

IOC holds 95 percent stake in the Ennore LNG import terminal whereas Tamil Nadu Industrial Development Corporation (TIDCO) has five percent stake. The company wants to retain a minimum 50 percent stake in the project and so practically 45 percent stake is available for the taking.

IOC plans to connect the Ennore terminal to its Chennai Petroleum Corporation (CPCL) refinery, apart from facilities of Madras Fertilisers, Tamil Nadu Petro Products, Manali Petrol Products, and other customers in the area.

The company is also working on laying a 1,385 km natural gas pipeline originating from the Ennore terminal to Nagapattinam in Tamil Nadu via Puducherry. Also, branch pipelines will be laid in Madurai, Tuticorin, and Bengaluru to meet the demand from multiple LNG consumers in the region.

← All latest storiesBack to top →