India and Nepal ink MoUs on cross-border energy and connectivityIllustrative image – not actual.

The Government of India on 1 June, 2023 signed several memoranda of understanding (MoUs) with the Government of Nepal, for projects which includes a second intra-country petroleum pipeline, conclusion of a revised trade and transit agreement, new joint hydropower projects and a long-term power trading agreement in the power sector, along with a fertiliser plant in Nepal.

Together with Nepal Prime Minister Pushp Kumar Dahal ‘Prachanda’, PM Narendra Modi also launched several projects through joint inauguration and presided over the exchange of MoUs and agreements, which includes a project development agreement (PDA) of 669 MW Lower Arun Hydroelectric Project between SJVN and Investment Board of Nepal, and the development of infrastructure at Dodhara Chandani check post along the Indo-Nepal Border.

The signing of a long-term power trade agreement will enable India import from Nepal 10,000 MW of power in the next 10 years. Moreover, India will enable Nepal to export power to Bangladesh by providing transit. Assessing the success of the Motihari-Amlekhgunj petroleum pipeline, further extension to Chitwan and construction of a new pipeline along with storage terminals at either ends between Siliguri and Jhapa in eastern Nepal will be taken up.

The two sides also signed an agreement on the cross-border digital payment mechanism between Nepal and India to encourage students, pilgrims and tourists from both countries as well as people from Nepal who visit India for medical treatment.

The ground breaking ceremony of phase-II facilities under Motihari-Amlekhgunj Petroleum Pipeline, as well as the Indian portion of Gorakhpur-Bhutwal Transmission Line being built by a JV of PGCIL and NEA was conducted. The Nepalgunj-Rupadia Integrated Checkpost was also inaugurated, apart from Bathana-Biratnagar cargo train.

← All latest storiesBack to top →