Illustrative image – not actual.IL&FS Transportation Networks in equal JV with Ramky Infrastructure bagged a Rs 467 crore order from Andhra Pradesh Road Development Corporation (APRDC).
The order is for the design, construction, finance, operation and maintenance of four-laning of Narketpally-Addanki-Medarametla Road (SH-2) from km 0.000 to km 212.500 in Andhra Pradesh under PPP on BOT basis.
The Project is on Toll basis with a Concession Period is 24 years including Construction Period of 910 days. The estimated cost of the Project is Rs 1,196 crore.
Also See:
IL&FS, Ramky bag Jorabat-Shillong project (21-May-10)
Related Links:
Project profile
