Illustrative image – not actual.A high-resolution study conducted by the Indian Institute of Technology (IIT) Ropar has found that storage loss due to silt accumulation in the Gobind Sagar reservoir of the Bhakra Dam is 19 percent, considerably lower than estimates made by the Bhakra Beas Management Board (BBMB).
Commissioned by the BBMB, the study conducted by a team of scientists led by Dr Reet Tiwari of IIT Ropar, used a 30-mtrs. resolution survey, the first of its kind in India, and estimated the average annual siltation rate at 30 million cubic metres (MCM), below the reservoir’s original design estimate of 33.61 MCM per year. The findings indicate that the reservoir has retained more storage capacity than previously suggested by conventional BBMB surveys, which relied on cross-sections spaced about 610 metres apart. The report comes as the BBMB has initiated plans to mechanically desilt the six billion cubic metre reservoir by inviting expressions of interest for excavation at Lunu in Bilaspur and Seer Khad in Una district. Around 150 MCM of silt is estimated to be available at each site.
Dr. Tiwari said, ““The de-siltation survey of the dam is going on by our team and its report will be submitted after one month,” and further added, "We have recommended to the BBMB to re-conduct this survey again after a three year interval to understand the siltation pattern more accurately. The de-siltation at the live storage at the dam can further improve water availability for Punjab, Haryana and Rajasthan.”
