Illustrative image – not actual.US-based Hyperloop Transportation Technologies (HTT) has presented a pre-feasibility route study to the Andhra Pradesh government.
As per the study the company has proposed a Hyperloop transport system with a length of 700-800 km from Anantapur in the south to the port town of Visakhapatnam in the north while connecting the new capital Amaravati in the centre.
The company suggested that the project can be executed in three phases with the initial phase running into five to 10 km straight section at Amaravati to demonstrate the working and benefits of the most modern ground transportation system.
The northern and the southern sections can be built in two phases or can be undertaken simultaneously.
Apart from this, HTT also proposed to set up a manufacturing complex that will focus on several aspects of Hyperloop project such as building the tube, capsule, track and 3D printing in Andhra Pradesh.
