Illustrative image – not actual.
Uttarakhand CM, Harish Rawat, has inaugurated the 1 MW hydro power project proposed on Tons river at Purkul village.
The hydro power project of small generation capacity has been inaugurated weeks after Uttarakhand government gave green signal to a proposal that sought drafting of a policy for Micro, Small and Medium Enterprises (MSMEs) to commission hydro power projects with power generation capacity of 1 MW to 25 MW and 25 MW to 50 MW.
Under the policy, village panchayat bodies will be allowed to share revenue from power generated through rivers and other water bodies.
