Hydro Power Development Corporation of Arunachal Pradesh aims 3,000 MW by 2030Illustrative image – not actual.
The Hydro Power Development Corporation of Arunachal Pradesh (HPDCAPL) has targeted to generate 3,000 MW through small and mini hydro power projects in the state by 2030. 
 
Chief Minister of Arunachal Pradesh Pema Khandu dedicated to the people the Sumbachu Small Hydropower Project (SHP) at Zemithang village here in Tawang district. 
 
The two x 1.5 MW power station has been built by the state-owned HPDCAPL. 
 
The Sumbachu SHP is the first commissioned project of HPDCAPL, which endeavours to generate at least 3,000 MW through small and mini hydro power projects in the state by 2030.
← All latest storiesBack to top →