Hyderabad Airport Metro inspects Corridors for connectivityIllustrative image – not actual.

Hyderabad Airport Metro (HAML) Managing Director NVS Reddy, along with senior engineers and technical consultants, conducted an inspection of the Metro Rail corridors to Medchal and Shamirpet.

HAML’s approach aims to create a seamless 60 km Metro corridor from Medchal to the airport, enhancing connectivity and providing better passenger amenities.

The inspection focused on resolving technical challenges related to alignment, especially concerning the steep curvature along the airport boundary. An elevated corridor is planned to pass below the Begumpet Airport runway through a tunnel for about 600 mtrs., which adds significant engineering complexities.

The team examined several key roads, including JBS-Secunderabad Club Road, Staff Road (Picket KV School Road), Mudfort Road, Tivoli Junction Road, Diamond Point Junction-Centre Point Junction-Hasmathpet Junction-Bowenpally Road, Tadbund-Anjaneya Swamy Temple Road, Tadbund Junction-Airport Office Junction-Bowenpally Check-Post Road.

Telangana Chief Minister A Revanth Reddy suggested initially combining the Paradise-Medchal and JBS-Shamirpet corridors, which would eliminate the need for tunnel construction. 

← All latest storiesBack to top →