HUDA receives approval for stormwater drain projectIllustrative image – not actual.

The government has cleared the stormwater drain project of Haryana Urban Development Authority (HUDA).


The project, estimated to cost Rs 140 crore, involves development of a drainage system in HUDA sectors and other residential areas in the city to accumulate stormwater and connect it to the Najafgarh drain.


As per the project, two drains will be constructed. Two drains will be laid through the city and will be covered with concrete for which the authority has made a detailed study for inviting a tender.


The first drain network will start from Nathupur to DLF, HSIIDC to Sector 23 and from there to Rotary Public School, Rezangla Chowk via New Palam Vihar, crossing the railway track and reaching Bajghera, from where it will connect to the Najafgarh drain and reach the Yamuna. This network will involve an investment of Rs 48 crore, and five km of this line will have drains that need extensive repair.


The second network of drains will start from HUDA City Centre, passing MG Road, Sikanderpur, MDI Chowk and Atul Kataria chowk, crossing Sheetla Mata temple, and reaching Sector 5, from where it will get to Palam Vihar and Northern Peripheral Road, up to Daultabad, going towards the Najafgarh drain. The 7.5 km on this stretch will need to be completely reworked, for which the government has sanctioned Rs 112 crore.

 

Related Link:
Project Profile

← All latest storiesBack to top →