HP seeks ADB fund for Rs.1,307 cr Shimla water supply schemeIllustrative image – not actual.

The Himachal Pradesh Government has proposed a Rs.1,307 crore Pabbar River fed gravity water supply scheme for funding to the Asian Development Bank through the Union Urban Development Ministry.

The state government had proposed a DPR on construction of gravity water supply scheme from river Pabbar to Shimla city.

Consultancy services for carrying out the survey, investigation, planning, preparation of detailed project report, implementation and commissioning support for renewal and rejuvenation of water supply and sewerage capacities for Shimla town, has been awarded to Water & Power Consultancy.

The proposal was divided into three parts, distribution system in Shimla town, sewerage network of missing lines and gravity water supply scheme. Feasibility of gravitating water via three different alignments had earlier been prepared which included Pabbar near Janglikh-Deudi-Dhamwari-Sungri-Baghi-Narkanda-Theog-Fagu-Kufri-Dhalli following track on northern side (off the road upto Baghi); Pabbar near Village Janglikh-Deudi-Chirgaon-Rohru-Tikkar-Ganeshidhar-Baghi-Narkanda-Theog-Fagu-Kufri-Dhalli alongside the road and Pabbar near village Janglikh-Deudi-Chirgaon-Rohru-Hatkoti-Jubbal-Kharapathar-Kotkhai-Chhaila-Theog-Fagu-Kufri-Dhalli alongside the road.

A tunnel of 750 mtrs length had also been proposed at an elevation of 2,540 mtrs below Ganeshidhar leading the alignment to Mel through Ratnari. A 3 kms. long tunnel had also been proposed near Mel Nallah at an elevation of 2,420 mtrs to lead the alignment to Reyog, avoiding higher altitude of Baghi-Narkanda from the proposed route alignment progressing towards Shilaroo alongside the existing road through Kyara.

← All latest storiesBack to top →