Hitachi Rail STS bags largest metro signalling package in India Illustrative image – not actual.

On 15 March, 2023, Chennai Metro Rail signed a contract with the consortium of Hitachi Rail STS SPA and Hitachi Rail STS India for the supply of signalling, train control and video management systems, in three corridors of phase-2 line.

This is the largest metro signalling packages to be awarded in India. The contract is valued at Rs 1,620 crore.

The signalling, train control and video management system will be deployed across 118 km, two depots, 113 stations, 138 trains and three maintenance rail vehicles. The project duration is 57 months for the entire phase-2.

The supplier will provide ultra-modern signalling, train control and video management system to facilitate automatic train operation (without driver). The communication-based train control system (CBTC) will support a minimum headway of 90 seconds.

The video management system will send real-time video streams to the control centre from all the trains, and the signalling system will enable automatic control of systems like trains, platform screen doors, passenger displays and announcements provided in all stations.

The live information gained from various subsystems like radio system, electrical system, tunnel ventilation system and others will facilitate a safe driverless operation.

← All latest storiesBack to top →